A Section 38 (or S38) agreement is a section of the 1980 Highway that can be used when a developer proposes the construction of a new road for residential, industrial or general transportation, which can be proposed to the road authority for adoption as a public highway. There are two main lanes to offer a new road for adoption to the road authority in order to become passable at public expense. Even if the building permit has been issued for a construction, the public has the right to comment and perhaps to investigate a change in a public priority right or the establishment of an existing public road, and the highway engineer may be invited to provide evidence before a public inquiry or court of justice to support the proposed amendment. Once the new road is completed and has satisfactorily reached its provisional maintenance period (usually one year from the opening for public use), it will be accepted as a public highway by the local motorway authority. “Adoption” means that the local road authority will assume full responsibility for future roadworks and will be part of the public highway with all the derivative rights. All amounts must be paid before section 38 closes. However, it can sometimes be difficult to convince developers or later sellers of newly completed real estate to accept any form of conservation. The usual argument is that there is an alliance in the original deed transfer that the developer train the streets. It is only to use as long as the developer still exists and would require very expensive legal proceedings to force. Section 38 of the Highways Act 1980 provides that once the building permit for a new building has been issued, developers may apply to the highway authority to adopt new roads built as part of the development, as well as related infrastructure such as sewers, lighting and support structures. Some other roads may not fit the local road introduction policy, for example.

B in a bad state. The work must be built according to a project and a standard agreed by the motorway authority. The proponent is responsible for carrying out the work at its own expense and the maintenance costs until it is adopted. A Section 38 agreement requires the developer to complete certain work within the prescribed time frame. For example, the pavement must be complete to the depth of the surface material (the layer under the finished roadway), sidewalks must be completed and public lighting must be operational. Therefore, compliance with the agreement should ensure a safe and usable highway for residents before its formal adoption. If the developer does not move the work satisfactorily in accordance with the agreement, the motorway authority will always try to resolve the problem first through negotiation. If this is not the case, road authorities will have the option of requesting the loan to pay for the completion of the motorway works. Highway drainage should be installed within the highway or an existing public highway.